Wednesday, January 10, 2018

2017 Year End Report



JORBA would like to thank the many volunteers that came out to work on Ringwood trails in 2017. Together we completed the Crossover/Ringwood-Ramapo west end re-route to the alternate bridge just south of Mill pond. We also built the new "State Line Trail" which is close to a mile long. This trail provides a safer and more enjoyable route through the woods to the Cooper Union north trailhead and to Sterling Forest without traveling on the busy Sloatsburg Rd.

In addition, we got a good start on the Crossover Trail re-route between Ringwood Manor and Shepherd Lake Rd. Part of that re-route included building a causeway and bridge across a wet area which took place November 15 - December 2 to avoid disrupting any sensitive habitat. Special thanks to Marc Perez for the loan of a Jorba Canycom, and to Ringwood State Park for providing the bridge materials. Also a special thanks to NYNJTC for the loan of a grip hoist and advice from their professional Trail Builder, Erik Mickelson. We also would like to thank Steve Boshart (55 hours) and Marianne Santangelo (41 hours) for your commitment and the many hours on this project. All of you were an important part of making this happen.

In 2017 Jorba volunteers at Ringwood State Park logged over 850 work hours on the trails. Those hours are valued at $17,850. by the State of New Jersey Parks department. Thanks to ALL volunteers! We will see you in the spring!





Canycom (mechanized wheelbarrow)

Wednesday, August 30, 2017

Ringwood Work Schedule - Fall 2017

Ringwood Trail Crew/JORBA has a full schedule of work days lined up for this fall. We have approval for a full re-route of the Crossover Trail (white blaze) between Skylands Manor and Ringwood Manor that will be under construction over the next few years. The more volunteers that come out, the faster this will get done. These re-routes will offer prime trail access between Ringwood and Sterling Forest.

This fall we will be addressing a swamp crossing. The actual work on the swamp will be taking place Nov 15 - 30 due to sensitive habitat. There is much to prepare (large rock moving) before the actual swamp area work days. It would be a great help if you could lend one day to help us prepare.

Fall Schedule:

September 16, Saturday: 9am meet at Shepherds Lake

October 8, Sunday: 9am at Shepherds Lake

November 4, Saturday: 9am at Shepherds Lake

November 12, Sunday: 9am at Shepherds Lake

November 15, Wednesday: 9am at work site. rsvp for location.

November 16, Thursday: 9am at work site. rsvp for location.

November 17, Friday: 9am at work site. rsvp for location.

November 18, Saturday: 9am at Shepherds Lake

November 19, Sunday: 9am at Shepherds Lake

Wear sturdy shoes and work gloves. Heavy or steady rain cancels. Tools will be provided. For more information contact Art rvcc@jorba.org

Monday, May 30, 2016

Crossover Trail Open!




Today the Crossover Trail project that was started in 2013 is officially open and complete. What started as a vision by James, our Ringwood crew leader in 2012, was jointly planned and proposed to the park and routes run through state data base. It was approved and fine tuned with shovels in the soil in March 2013. Three plus years of trail building and finally the new section of trail is marked and open from Warm Puppy (red) to the intersection of Crossover and Pierson Ridge trail (blue). Jorba and the Ringwood Trail Crew would like to thank the many volunteers that have come out and made this project happen. Over 1500 volunteer man hours went into construction which is valued by the park as $34,500. of free labor.

The trail serves a variety of levels of mountain bikers, as well as hikers, making it a very popular trail. Although most people have been riding the trail out and back since they enjoy it so much, portions of the trail help link together many other popular trails in the park. So please do go explore the beautiful forest and many trails. Right now wild roses and lady slippers are blooming, toads, efts and centipedes are everywhere. It's a great time to be out there!

Friday, May 15, 2015

Spring 2015



A long cold winter has finally given way to spring. The trail conditions have been excellent! Volunteers have already put in over 70 hours this season on the Crossover Trail build. If you have not been up there, please do check it out. We are progressing each week and hope to reach the top by the end of the year, but that depends on all of you, and how many volunteers come out to work. Think of it like investing in more future riding trails.

Dirty Thursdays will run all year until September. Crews start around 4:00 and best to rsvp for location and updates. There will also be some weekend dates that will be added to the schedule this week. Please check back for them or go to Ringwood Trail Crew FB page for more dates.

Happy Trails!

Sunday, December 7, 2014

Thanks to Volunteers!



The 2014 Ringwood Trail work season is complete. Jorba would like to thank all it's 45 dedicated volunteers that came out to lend a hand at Ringwood this past year. We logged 579 man hours. The park values those hours at $13,000. of labor. Whether you came for an hour or returned every week to work, your efforts are appreciated and the trails are in great shape because of you. Section 3, 4 and 5 of the Crossover Tr re-route are compete. Section 2 has been started and we hope you all come back next year to help finish that section.

With the pipeline construction going on the past few years, Ringwood state park has been a mess to ride through. The pipeline work is finally done and the corridor has been restored. You should be able to find most crossings by a path in the grass or trail marker. Enjoy!

I hope you all get out for riding before too much snow falls. See you all next spring!

Wednesday, August 6, 2014

Project Update



Summer is winding down and there is much to report on what has been done and is about to begin this week. Yes, we are paused and ready to start our next push of new trail up to Pierson Ridge. Our next weekend work day is Sunday Aug 10. Meet at Ryerson School 130 Valley Rd Ringwood NJ 07456. Be prepared to ride bikes to the work site, as it is a few miles in.

Summer projects have gone really well, thanks to the hard working volunteers. Warm Puppy is now connected to last years work and is riding really well according to reports. Last Thursday, a minor repair was done near Warm Puppy. Dirty Thursday plans to meet again tomorrow Aug 7th in Lot C to do another repair. The last Dirty Thursday Aug 21, crews will be working near Webly Pond on the new section or where needed. Please RSVP for location.

Saturday, June 7, 2014

National Trail Day



National Trail Day build day may have been a last minute addition to the schedule, but enthusiastic volunteers worked in a large way today! The bulk of the trail is complete and may be opened up for use in a week or two. Jorba would like to thank it's National Trail Day trail crew for giving 34 hours today:

Henry
Alex
Mark
Sandy
Chris
Willy
Patti
Art
Ellen

Thursday, June 5, 2014

2014 Progress and Work



It may have seemed like spring took it's time to get here, but volunteer trail workers were out there working as soon as the snow melted. Art and I led the first few trail sessions working directly for the park service trying to re-route a trail that had been obliterated by the development of some rogue lines leading people off the trail. We had laid out a new route in the winter before the snow came, so that we could get right to it in the Spring.

As work began, the new line suffered vandalization the first few weeks. We consistently returned and repaired it with crews and moved ahead. It was challenging to keep volunteers from getting discouraged about the vandalization, but we advised them that we are many strong and do not plan to give up that easily. The new trail laid in beautifully and many have come to us and said "the trail should have been there from the beginning". So, although we needed to return to this trail 3 years after it was built, I think we have a better trail now. I am not backhandedly thanking the rogue builder, but many good things have come from this experience, and I think many have learned and are better trail builders and advocates today.





With that behind us, we are back to working on the Jorba Cross-over trail re-route project. This next section will connect last years work to the intersection at Warm Puppy Rock. We are more than halfway through that section. Our next work day will be Saturday June 7, National Trails Day. We would love to see you all come out and lend a hand in completing this section. Meet at Lot C by 9:00 am. Be sure to let the park employee at the toll booth know that you will working with Jorba Trail Crew.




Saturday, November 2, 2013

To Paydirt or not to Paydirt?

Every year someone raises the question “Should there be Paydirt?” usually this question comes from a racer, but in reality it is about more than just racing. I would like to take some time to explain what it is all about.

First, what is Paydirt? Paydirt is the program that records volunteer trail work hours for JORBA (Jersey Off Road Bicycle Assoc). The program has several purposes. It creates incentives for mountain bikers to volunteer in local public parks. It encourages mountain bikers to build working relationships with land mangers. It encourages trail maintainers to record their volunteer hours so that the hours can be used towards grants. It helps build working relationships between trail maintainers, race promoters and land mangers, assuring bike access and the continuation of bike community fund raising events like racing on public lands.

So, where and how did Paydirt start? Paydirt, a concept brainstormed by trail advocates Wally Tunison and Sarah Frost in 1996, was the birth of Jorba. Wally, a long time motorcycle racer adopted the idea from enduro racing where dirt bike racers had to do trail work to allow access onto public lands for racing. Sarah created a similar program called Paydirt to encourage mountain bike racers to step up and help land managers maintain trails to keep bike access in New Jersey Parks. At that time, both Essex and Bergen Counties had banned bikes from the trails leaving many mountain bikers with no local trails to ride. Since then, Paydirt has logged over 60,000 volunteer man hours in actual trail work, and has received recognition from many land mangers. If you have ridden trails in NJ, you already know that there are some pretty cool trails that mountain bikers have built and maintained legally.

As a trail maintainer, I can confirm that the series race point system brings in many hours, especially in the final month. I am sure that many serious racers find Paydirt very annoying, and would rather spend 100% of their time training. They may say it has nothing to do with racing, but in actuality, it has everything to do with racing on really cool trails on public land. These trails would not exist to race on if racers did not come out to help. Of course not all racers know this, because they do not take the time to get involved or look beyond racing, hence the need for education. Every year a new wave of racers enter the fold, uneducated about trail access and the future of the sport. As they take the hook, they immediately learn about Paydirt and come out to get their points and see what it is about. Many of Jorba's trail care leaders started as racers. Some still are racers. It is not "me" or "them", it is "us". Paydirt is built in education for those that enter the sport through racing. There are places for serious racing like National Championships, which by the way are on private land. However if you want racing on cool public trails to live on, your best bet is to support the Paydirt program.

As far as the grants go. Each Jorba park has a volunteer leader or trail boss. Ideally, each park should have 4-5 leaders to keep things running smoothly. Jorba is lucky to have one person per park that will handle the responsibilities. We all know that when we are not at our paid jobs, we want to be out riding our bikes. Besides exercise being good for our physical health, mountain biking is an important part of our emotional health in the form of stress relief. Trail bosses take their personal time to lead trail work crews, and they still need to take time to record hours, file reports and make proposals with the park. This is where Paydirt comes in. You may think that you are the annoying racer that is pleading to get signed off for points, but you are actually helping Jorba get recorded for grant purposes. Jorba thanks the trail bosses and the racers for following through with paperwork that not only advertises what Jorba does, but helps the project and tool grant process as well.

As the Paydirt Administrator, I may be biased about how great Paydirt has been for mountain biking in New Jersey, but by having my eye on it every week, I have seen great things happen for the sport. In 2013 racers in the H2H series performed close to 1200 hours of volunteer trail work. The state of NJ values it's volunteer trail work at $23. an hour. That is $27,600. that Paydirt brings in for it's trails from racers. Do you like riding Jungle Habitat, Six Mile Run, Ringwood, Allaire and Allamuchy? ...much of them built on Paydirt. I urge you to support Paydirt and most importantly, get involved. For those of you that have participated and support Paydirt, Jorba thanks you! .... Now let's go out and ride!


Ellen




Saturday, August 31, 2013

Summer Building Winding Down





Thanks to the volunteers that came out to work on the Crossover Trail re-route this past week. A good chunk of this re-route is complete. We will probably work a few more Thursdays to finish this section up, so that it can be blazed and opened shortly. Yes, I know I use "we" loosely, as I have not been able to work myself due to a sprained ankle. I hope to be well enough to work next Thursday. While on the subject of volunteers, I would like to mention a few: James and Manny have been above and beyond in not only helping with actual work, but in also helping with planning and leading volunteers. This has been a huge help for Art, and also allows for fresh ideas to come into the mix at the planning and building stages. If you like the trail and run into these guys, please let them know how you feel. They deserve some credit for these improvements.

If you have been out riding these 2 new trails, I'm sure you have noticed a slightly different flow from many other trails in the park and actually less rocks on the trail. This is not a permanent sea change in our trail building style, but rather an attempt to add variety into the park in a way that will suit it's users. As we work east up to Peirson Ridge, the trail will be more advanced as it goes deeper into the park.

If you would like to work the next few Thursdays, please rsvp to Art Wednesday night for his work plans. September hours will count for 2014 race Paydirt points.



Lots of rain this year has made an incredible display of mushrooms in the park. I hope you all get a chance to get out to enjoy in between the rain drops.











Thursday, August 15, 2013

Crossover Trail Part 2



Thanks to all the volunteers that have come out this year. Construction on the first section of the crossover trail re-route is complete, however it will not be blazed until the upper section is complete. We hope to start that section late next year. The past few weeks, we also took the time to do a small re-route on the race course poison ivy section and both this section and the new crossover section flow nicely together and are riding great.

We have started our next section of re-route which will eliminate the muddy road between Millie Whites and Ice pond. We plan to work Thursdays through the end of August, and have Saturday August 31 penciled in as tentative. We will confirm on that a week before. So if you are looking for some last minute Paydirt, we may be able to put you to work on the last day for 2013 points.








Saturday, May 18, 2013

Crossover Trail Part 1 of 5 Near Complete





Since the first official work day in March, we have put in 11 work days, working every Thursday and a few weekend days. During those days, 45 volunteers have put in over 350 hours. Without volunteers, this would not get done, so we would like to thank all that have come out to help in whatever form they have been able. This trail is made by them, and we hope they feel a connection to the process and the trail itself.

The actual work done so far has included: layout, design, bench cutting and rock work. This section of Ringwood is surprisingly less rocky than most other sections, offering some much needed moderate and flowing terrain in the inner loops closer to parking lot C. No need to stress if you are a tech loving rock freak, because as our project goes east, the terrain becomes much more steep and rocky and the trail will reflect the more extreme terrain. If you like our work on red going out to Skyline Dr, it will be more like that.

In the mean time, we are thrilled to offer some flowing, low angle single-track, instead of eroded fire roads as connectors to the already popular riding trails. We anticipate that this project will greatly improve the ride/hike experience within the Brushwood section of Ringwood.

We have two Thursdays ahead and Saturday June 1, National Trail Day when we hope to to complete the finishing touches and officially open this section at both ends. If you are able, we hope you can come out to help during the next few weeks to make this happen. Happy Trails!



Sunday, March 31, 2013

First Trail Work Day!



Thanks to the 29 volunteers that came out to work 110 hours last Saturday! Jorba volunteers made great progress this first day in 2013. Section 1 of 5 of the proposed trail re-routes has been cleared and raked with a great start to bench cutting and rock working. We plan to continue with tread work over the next series of works days, until this section is complete and open for riding.

For those looking to get in some week day work, Art will be starting Dirty Thursday work nights this week April 4, and working from 4:00-7:00pm. Meet at the work site when you can by foot or bike. RSVP for location by 2:00 that day, so Art has enough tools. He plans to pull tools in to work site by bike and trailer.

Also another work day in April has been added: Sunday April 14, 9:00am meet at Reyerson school and work until 1:00.
Reyerson School
130 Valley Rd
Ringwood NJ 07456

Happy Trails!
Ellen

Thursday, March 21, 2013

First Work Day March 30 !!



As you know, Spring has arrived according to the calendar, yet there may be some doubt in our minds as we look over the woods covered in snow. Please don't let that little bit of snow, ruin your dreams, ... spring will show her face and we will be riding and building trails very shortly.

We have great news for 2013. The park has approved for us to build some new sustainable single-track on the Crossover Trail (white) that will replace existing routes co-aligned with certain eroded fire roads. What does this mean? .... mountain bikers and hikers will be able to connect already great popular trails with single track. This will greatly improve the ride and hike experience for all, and we are really exited about this. However, we need all of you, in the form of volunteers to make this happen. I hope some of you will come on out and volunteer.

Our first trail building day is less then 2 weeks away on March 30th. We will be starting the Crossover Trail (white) project with hopes of completing the first few sections this year.

First Work Day:
March 30th Saturday
9:00 am
Meet at:
Ryerson School parking lot. (Park and lot C are still closed)
130 Valley Rd
Ringwpood NJ 07456

Please bring work gloves and sturdy shoes, tools will be provided. Steady rain cancels. Plan to walk in about 1 mile on low angle climbing.

Message from a Ringwood trail crew leader:

As many of you know, volunteers have built most of the trail we ride on. That being said you guys have built 2 of the best trails in the area the last couple of years, Skylands and the Red trail to TOS, these two trails are by far my favorite ones to ride. We are very excited about the White trail project and when you get out and see what we are doing I hope you will be too. We have hopefully designed and will build another gem for all mountain bikers to enjoy. Hope to see you all on the 30th.

James

Wednesday, March 6, 2013

Pipeline Construction 2013

Please be advised that pipeline construction is underway and some of Ringwood State Park Brushwood section between Shepherds Lake and Ice Pond Rd is considered closed and signed accordingly. This is effective immediately until April 15 2013. The Ringwood-Ramapo (red) trail from Ice Pond Rd heading south to Skyline Dr remains open and is not effected by construction. Trail maintenance during this time time will meet at Reyerson School.

Tuesday, January 29, 2013

2012 Wrap Up



Looking back on last year, I feel as if we crossed a major milestone by completing re-routes on the Ringwood-Ramapo Trail to Skyline Project. We projected the project to take three to five years and at times some thought it could never be done. Three years later and now that it is done, there is much satisfaction each time I go out and ride this section.

Besides establishing a legal for bikes connector trail between Ringwood and Ramapo Mountain State Forest, the engineering project itself was quite ambitious, as the original trail was aligned in very steep rocky terrain. This project was our most challenging project to date, and has been a great learning experience in many ways. We both hope that we are better trail builders for gaining this experience.

After completion of this project in August, Art and I scheduled a well deserved break from trail work to absorb all that we had learned as well as to take the time to start the ground work for the next project. However, mother nature had it’s own plans, when Hurricane Sandy blew down many trees in Ringwood and Ramapo, leaving some areas un-passable by foot or bike. Thankfully, for the many volunteers that stepped up, we were out there working and clearing the trails before we had power and communications back at our homes. I suppose these parks are like home to many of us.

Many thanks to our hard working volunteers that give their time to our trails! Jorba volunteers logged 664 hours at Ringwood in 2012. Looking forward to new and exciting projects in spring!

Sunday, November 18, 2012

Thanks to Nov 18 Volunteers



Once again, we have been blown away with all the volunteers that showed up today to give their love to the trails at Ringwood State Park. Ringwood is a very special park and it is great to see that so many others feel the same way. Today 22 volunteers came out to clear and repair trails after Hurricane Sandy. More fallen and uprooted trees than we could count were cut out as well as some re-routes built in a total of 116 hours. ... thanks all! Shepherds Lake to Skyline Dr is clear for riding and hiking.

Friday, November 16, 2012

Sandy Clean Up Continues



Ringwood State Park was hit pretty hard with Hurricane Sandy. As of November 14, the trails are technically still closed. Jorba is working hard to clear fallen trees and get things back to normal as quickly as possible.

The Ringwood Ramapo (red) trail has been cleared from Warm Puppy all the way out (yellow) and out to the top of Skyline Drive. In addition, the south end of the park including Catsnest has been cleared. This Sunday, crews will be working their way north on the Ringwood Ramapo and Skylands Trail to clear all the way down to Shepherd's Lake. Volunteers should rsvp to ringwoodmtb@gmail.com

In addition to Hurricane damage, the pipeline construction has begun. Please be aware of machine traffic on the pipeline and woods roads, as well as any temporary minor closures. Thanks and see you on the trails soon!

Ellen

Tuesday, September 4, 2012

Resetting the Stone



After last years Hurricane Irene, an up-rooted fallen tree up-lifted a stone bridge on the Ringwood Ramapo Trail that had been in place for longer than anyone could remember. The large stone remained hanging by a point on the root ball for almost a year until Jorba volunteer, James Bazzano came up with a plan to try and reset the stone onto a new and more stable footing.

James, along with Tom Pannorfi and Art assembled a pallet rack with 2 hoists with a 77 to 2000 lb. advantage to lift the stone and reset it on a new footing. The hoists needed to be re-situated several times by lifting and setting back down the stone until it reached a good placement. This whole process took half a day with assembly and moving.



Afterwards the tree was cut from the root ball, allowing the roots to settle back down and allow safe passage onto the newly placed stone bridge. Within minutes of completion, a frog and giant spider were checking out the new bridge.



A big thanks to James for the vision and know-how to make this happen, and to Tom and Art for lending a hand and volunteering their time and labor on Labor Day of course.