Saturday, March 17, 2012

March 17 Work Day



Ringwood - Ringwood/Ramapo Tr: Next section worked was just beyond the intersection of the Old Guard Tr (green/white). A small group of volunteers came out on this beautiful March day and got the bulk of this section done. A gap was filled to bridge onto a big slab, and the bottom of the slab was built up with a rock ramp. Also a small set of stairs for hikers was built and the lead up was bench cut. Looking good and may be opened up after a few Dirty Thursday sessions.


Before


After


Bridged gap, stairs to right

Thanks to volunteers that put in 39 hours:
Henry Gozdz
Willy Wilbur
Marianne Santangelo
Ted Haack
Ryan Hogan
- Art and Ellen